Machine Introduction; Positioning Of The Machine - Kemppi FastMig Pulse 350 Operating Manual

Hide thumbs Also See for FastMig Pulse 350:
Table of Contents

Advertisement

2.3

Machine introduction

1.
CHANNEL
2.
7.
5.
1.
Setup panel 'Arc Wizard P65'
2.
Main switch I/O – On/Off
3.
Signal lamp I/O – On/Off
4.
Warning lamp for thermal protection
5.
Welding cable connection - negative pole
6.
Welding cable connection + positive pole
7.
Control cable connection
8.
Fuse – 6,3 A delayed
9.
Control cable connection
10. Mains power cable
2.4

Positioning of the machine

Place the machine on a sturdy, level surface that is dry and does not allow dust or other
impurities to enter the machines cooling air flow. Preferably site the machine to a suitable
carriage unit so it is above floor level.
Notes for positioning the machine
• The surface inclination may not exceed 15 degrees.
• Ensure the free circulation of the cooling air. There must be at least 20 cm of free space in
front of and behind the machine for cooling air circulation.
• Protect the machine against heavy rain and direct sunshine.
The machine is not allowed to be operated in the rain as the protection class of the machine,
IP23S, allows preserving and storing outside only.
Never aim the spray of sparks from a grinding machine toward the equipment.
NOTE!
© Kemppi Oy / 1515
3.
4.
6.
10.
8.
6,3A
EN
9.
5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fastmig pulse 450

Table of Contents