7A. INSTALLATION OF BASE (MOBILE STAND)
1.
Open the center support assembly box as
shown in fig.-1.
2.
Remove the tool kit and foam sheets as
shown in fig.-2.
3. Lift up the Centre Support assembly as shown
in fig.-3.
4.
Place the Centre Support assembly on the
floor as shown in fig.-4.
5.
Open the Wheel Support assembly boxes as
shown in fig.-5.
6.
Remove the foam sheets as shown in fig.-6.
10
6137000-795
Prima ENT/DNT
Prima ENT/DNT
Fig 1
Fig 2
Fig 3
Fig 4
Fig 5
Fig 6
Issue 1.5
Printed on Feb.26,2019
Need help?
Do you have a question about the PRIMA ENT and is the answer not in the manual?