Planning Irf Fabric Setup; Planning Irf Fabric Size And The Installation Site - HP A5500 HI Series Installation Manual

Table of Contents

Advertisement

Step
1.
Plan IRF fabric setup
2.
Install IRF member switches
3.
Install the grounding cable, power
supplies, and power cords
4.
Power on the switches
5.
(Optional) Install an expansion
interface card
6.
Configure basic IRF settings
7.
Connect the physical IRF ports

Planning IRF fabric setup

This section describes issues that an IRF fabric setup plan must cover.

Planning IRF fabric size and the installation site

Identify the number of required IRF member switches, depending on the user density and upstream
bandwidth requirements. The switching capacity of an IRF fabric equals the total switching capacities of
all member switches.
Plan the installation site depending on your network solution, as follows:
Place all IRF member switches in one rack for centralized high-density access.
Distribute the IRF member switches in different racks for dispersed access.
NOTE:
An A5500 HI IRF fabric can have up to nine switches. As your business grows, you can plug an A5500
HI switch into an IRF fabric to increase the switching capacity without any topology change or
replacement.
Description
Plan the installation site and IRF fabric setup parameters:
Planning IRF fabric size and the installation site
Identifying the master switch and planning IRF member IDs
Planning IRF topology and connections
Identifying physical IRF ports on the member switches
Planning the cabling scheme
See
"Installing the switch in a 19-inch
on a
workbench."
See
"Grounding the
switch,"
and
"Connecting the power
N/A
See
"Installing/removing an interface
See HP A5500 HI Switch Series IRF Configuration Guide.
Connect the physical IRF ports on the switches.
Use CX4 cables to connect CX4 ports over a short distance.
Use XFP transceiver modules and fibers to connect XFP ports over
a long distance.
Use SFP+ transceiver modules and fibers to connect SFP+ ports
over a long distance, or use SFP+ cables to connect SFP+ ports
over a short distance.
All switches except the master switch automatically reboot, and the
IRF fabric is established.
32
rack" or
"Mounting the switch
"Installing/removing a power
cord."
card."
supply,"

Advertisement

Table of Contents
loading

This manual is also suitable for:

A5500-48g-4sfp hiA5500-24g-4sfp hi

Table of Contents