Assembly

Protruding parts such as stops, handles, etc. need to be secured by measures provided by
the customer if necessary in order to avoid dangers for persons.
Provide sufficient space for assembly and operating staff as well as for material transport.
Also allow for accessibility for setting and maintenance works.
Make sure that the mains power of the milling machine is freely accessible.
Provide for sufficient illumination (minimum value: 47 Lumens/ft², measured at the tool tip).
In case of insufficient intensity of illumination provide for additional illumination i.e. by a
separate workplace illuminator.
INFORMATION
The main power of the geared drill has to be freely accessible.
3.4.2
Assembly
WARNING!
Danger of crushing and overturning.
The geared drill must be installed by at least two persons.
3.4.3

Load suspension point

Fig. 3-1: Load suspension point
Secure the lifting loop in the eye bolt on the drilling head
3.4.4

Installation

Check the horizontal orientation of the base of the geared drill with a level.
22 / 07 / 2014
Load suspension
points
Eye-bolt
Lifting fixation
devices
Version 1.0.3
OPTIMUM
M A S C H I N E N - G E R M A N Y

„Operating material" on page 17.
B50 GSM
Geared drill
Page 21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents