Optimum B50 GSM Operating Manual page 42

Geared drill 29 inch
Hide thumbs Also See for B50 GSM:
Table of Contents

Advertisement

OPTIMUM
M A S C H I N E N - G E R M A N Y
Interval
Start of shift
after every
maintenance
or repair ope-
ration
Page 42
Geared drill
Where?
What?
How?
Abb.6-6:
Fill in the open gear lubricating system of drill about 2.7
Turn the gear drill.
Check the oil level sight glass. The sight glass (oil removed)
Fig.6-5: Check the oil level in the sight glass. The
Oil level of the gear of the
drilling spindle sleeve
Fig.6-7: Operation diagram
ATTENTION!
The drill is no transmission equipment (Oil, coolant)
is delivered. Complete before start only oil and
coolant.
Fill the gearbox with gear oil.
quarts of oil.
operation needs to be covered during the half.
B50 GSM
Maintenance
sight glass should be
half-covered.
Oil filling
Oil flow during operation
Oil draining screw
Sight glass
Version 1.0.3
22 / 07 / 2014

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents