Storage; Installation And Assembly; Site Requirements - Optimum B50 GSM Operating Manual

Geared drill 29 inch
Hide thumbs Also See for B50 GSM:
Table of Contents

Advertisement

OPTIMUM
M A S C H I N E N - G E R M A N Y
3.3

Storage

ATTENTION!
Improper storage may cause important parts to be damaged or destroyed.
Store packed or unpacked parts only under the following ambient conditions.
Please follow the instructions and indications on the transportation box:

Fragile goods (goods require careful handling)

Protect against humidity and humid environments

„Ambient conditions" on page 17.

Prescribed position of the packaging box (marking
the top side – arrows pointing upward)

Maximum stacking height
Example: non-stackable – do not pile any further
packaging boxes on top of the first packaging box
Consult LDS Industries if the geared drill and accessories have to be stored for a period of over
three months or under different external conditions than those given here
page 5.
3.4

Installation and assembly

3.4.1

Site requirements

Organize the working space around the geared drill according to the local safety regulations.
INFORMATION
In order to provide for good functionality and high machining accuracy as well as long durability
of the machine the site should fulfill certain criteria.
Observe the following items:
The device must only be installed and operated in dry ventilated places.
Avoid places nearby machines generating chips or dust.
The site has to be vibration-free, i.e. at a distance from presses, planing machines, etc.
The substructure has to be appropriate for geared drill. Also make sure that the load bear-
ing capacity and the evenness of the floor are appropriate.
The substructure has to be prepared in a way that possibly used coolant cannot penetrate
into the ground.
Page 20
Geared drill
B50 GSM
Assembly

„Information" on
Version 1.0.3
22 / 07 / 2014

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents