Charge Pump - Danfoss 90 Series Service Manual

Hide thumbs Also See for 90 Series:
Table of Contents

Advertisement

Service Manual
Minor repair

Charge pump

52
Series 90 Pumps
2. Take care to assure the surfaces are clean and free of any foreign material or paint prior to installing
the auxiliary pad.
C
Caution
Do not allow the force of the cylinder block spring and swashplate leveler springs to separate the end
cap from the pump housing. Gasket damage and external leakage may result.
Auxiliary pad components (typical)
J80
Endcap screw
J70
Screw torque
See appropriate table for wrench size and torque
Reassembly
1. Lubricate and install O-ring (J50) on end cap pilot.
2. Install the auxiliary mounting pad (J60) on rear of endcap.
3. Install four large screws (J80) and new washers (J70) through the mounting pad and end cap into the
housing. Torque per the accompanying table.
Torque endcap screws in a criss-cross pattern
End cap screw torque
Frame size
030
042
055
075 – 130
180 – 250
The following procedure shows how to remove and install a charge pump.
Removal
1. For pumps with an auxiliary mounting pad, refer to the
C
Caution
On earlier production frame size 75 pumps with twin ports, secure the endcap to the pump housing
with a clamp to avoid gasket damage.
2. Remove the six screws (H80) holding the charge pump cover retainer (H70).
520L0818 • Rev 0101 • August 2015
J50
J60
E101 084E
Torque
58 N•m [43 lbf•ft]
75 N•m [55 lbf•ft]
122 N•m [90 lbf•ft]
298 N•m [220 lbf•ft]
580 N•m [429 lbf•ft]
Auxiliary Pad
instructions.

Advertisement

Table of Contents
loading

Table of Contents