SP600 installation and user's guide
www.renishaw.com
Datuming SCR600
Software alignment for the SCR600
This section describes the suggested software alignment routine to find the positions of the SCR600 ports. These instructions assume
that the SCR600 has the X-axis as its docking axis.
Port lids 1 and 4 should be in the retained position, which is achieved by sliding the lids back to the extreme of their travel where a magnet
/ slot mechanism will hold the lids open.
Step 1 - Establishing docking depth (X)
Take points P1 and P2 as shown below.
To establish the docking depth (X-axis) for all ports, the following calculation should be used:
Step 2 - Establishing docking height (Z)
Take point P3 as shown below.
To establish the docking height (Z-axis) for all ports, the following calculation should be used:
Step 3 - Establishing docking centre for port 1 (Y1)
Take points P4 and P5 as shown below.
Calculate the centre line of these points.
Issued 01 2018
X position of P1 / P2 + stylus ball radius + 21.5 mm (0.85 in)
Z position of P3 - stylus ball radius - stylus length - 8.4 mm (0.33 in)
22