Step 2 Drill cabinet mounting holes in channel steels by using a hammer drill.
----End
Combining the Power Cabinet and Bypass Cabinet
Step 1 The method of combining the power cabinet and bypass cabinet is the same as the method of
combining them on the ground.
----End
Securing the UPS
Step 1 Use M12 x 45 comment bolts to secure the cabinet to the mounting holes in the channel steel
and tighten the bolts.
Step 2 Install the front, rear, left, and right anchor baffle plates.
----End

3.2.2 Installing Batteries

Context
Procedure
Step 1 Install a battery rack and batteries.
For details, see the battery installation guide delivered along with batteries.
----End
Issue 03 (2017-10-16)
It is recommended that the external sides of front and rear channel steels be aligned with
the column. The channel steel spacing is 800 mm. The recommended channel steel width
is 50 mm or more.
Cabinet mounting holes must be aligned with channel steel mounting holes, and secure the
cabinet to channel steels with bolts.
Before installing batteries, read through the battery safety precautions, obtain the delivered
battery installation guide, and install batteries as instructed.
Place the batteries in a correct way to prevent vibrations and shocks.
Install the batteries from the lower layer to the upper layer to prevent falling over due to