Start-up

Connecting the gas flow

Do not fill any downstream pipelines or station sections through the TERZ 94. This may
speed up the turbine wheel and lead to excessively high flow rates with resultant
damage.
Short-time overload operation of 20% above the maximum flow rate Q
damage will occur in the case of a return flow without shocks.
Before starting up the device, make sure that all lines have been correctly installed and connected
in the terminal compartment.
The case must be completely closed.

Initializing the totalizing unit

When you start up the device for the first time, set the totalizing unit in the desired condition.
Check the programming of the pulse width, the LF pulse scaler, etc.
TERZ94-S:
Check the programming of the current output mode.
Note:
All parameters can only be changed after the cover of the meter has been removed.
...........................................................................................................................................................................................................
Manual TERZ 94 · EN09a · 2017-11
START-UP
is permissible. No
max
19