General Information - NEC EXPRESS5800/180Ra-7 User Manual

Hide thumbs Also See for EXPRESS5800/180Ra-7:
Table of Contents

Advertisement

General Information

This chapter contains step-by-step instructions for upgrading your system. When
you disassemble any part of the server, note the orientation and placement of
any cables or shielding that you remove.
The DC push button on/off switch on the front panel does
not turn off system AC power. Also, +5vdc is present on the
system board whenever the AC power cord is connected
between the system and an AC outlet. Before performing
any procedures, first power off the DC by pushing the power
on/off button located on the front panel. Make sure your
system is powered off and the AC power cord is unplugged
from the system. Failure to disconnect power before opening
your system can result in personal injury and equipment
damage.
The server management logic on the system board monitors
system voltage changes. When powering your system up or
down, you may experience a 1- to 5-second delay from the
time you press the push button power on/off switch and your
system powering up or down. This is normal system
operation and is required by the server management logic.
Operating your system with the access cover removed can
damage system components. For proper cooling and airflow,
always replace the access cover before powering on.
4-2 Upgrading Your System
!
WARNING
! CAUTION
! CAUTION

Advertisement

Table of Contents
loading

Table of Contents