Chapter 2 System Maintenance; Introduction; Operational Test Procedures; General Information - NEC UNIVERGE SV9100 System Maintenance Manual

Hide thumbs Also See for UNIVERGE SV9100:
Table of Contents

Advertisement

System Maintenance
I
S
1
NTRODUCTION
ECTION
The technician can use this book to troubleshoot and diagnose problems
during and after system installation. The troubleshooting flow charts and
general test procedures help the technician identify possible causes of the
problem by defining the problem area.
Using the System Data Upload/Download feature, all System
Programming and Speed Dial data can be stored on disk for safe keeping.
After all System Programming is completed, it should be downloaded to a
disk for backup. When system memory fails, this data on the disk can be
uploaded and the memory restored.
O
S
2
PERATIONAL
ECTION
2.1
2.2
System Maintenance Manual
T
P
EST
ROCEDURES

General Information

When an UNIVERGE SV9100 system is first powered up, an
initialization is performed. During this process the GCD-CP10
(CPU), located in the first chassis, scans each interface slot to
determine the hardware configuration used. This information is
stored in the resident system program memory with the system
default values. This section provides test procedures that are used
before, during, and after the initialization process.

Before Initializing

The technician must follow these steps before initializing the
system.
2.2.1

Cable Connections

All wiring for power supplies or flat cable connectors
should be checked for solid connections.
Chapter
2
2 - 1

Advertisement

Table of Contents
loading

Table of Contents