HIOS HSV-10RB Instruction Manual page 22

Neji taro v for automatic assembly, hsv-rb series, automatic screw feeder
Table of Contents

Advertisement

⑥.Operational check
After checking and adjusting each component, do an operational check with screws loaded.
If any abnormality is found, make the said adjustments once again in addition to the rail vibration and front/rear position
adjustments.
After completing the operational check, return the wiring arrangement to its original status.
When installing the cover, take care not to catch or pinch the wires.
Watch that the wiring does not hinder the operation of this machine.
- 21 -

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents