Cleaning
2
3
-
The cleaning cycles refer to a cleaning pressure of
-
The spraying cycles indicated for the individual cleaning steps
are reference values, only. In specific applications, these times
must be adapted considering the product, pressure ratio and
degree of soiling.
-
The flushing quantity per CIP spraying cycle is about 1.2 litre /
10 sec. at a cleaning pressure of min. 2 bar - max. 5 bar.
air supply with integrated particle filter
1
control air connection for main actuator
2
control air connection for spring-side support of actuator
with compressed air via NOT element
cleaning step
pre-flushing
caustic flushing 80° C
intermediate flushing
acid flushing
subsequent flushing
cleaning of the leakage chamber via leakage valves
CIP IN
CIP spraying cycle
2 x 10 sec.
3 x 10 sec.
2 x 10 sec.
3 x 10 sec.
2 x 10 sec.
(with resp. break of 10 sec.)
p = 2-5 bar.
G ¼
CIP OUT
Double seal valve with diaphragm and ,,fan support"