Powering The Unit On And Off - Unisys e-action Source NDP Installation And Operation Manual

Source capture network document processor
Table of Contents

Advertisement

Source NDP Operation and Document Processing

Powering the Unit On and Off

An On/Off switch is located at back of the unit, as shown in Figure 3-1.
Press "|" on the power switch to power on the Source NDP unit. The Power
status light (top indicator) should turn solid green. Refer to Section 6 if a
problem occurs.
Press "O" on the power switch to power off the unit.
When the unit is powered on, status light activity monitors the following start-
up sequence:
1. The Ready indicator (middle indicator) blinks yellow while a connection to
the host PC is established. This normally takes 30 to 40 seconds.
2. The Ready indicator blinks green while the unit waits for a response from
the application at the host PC.
3. The indicator is illuminated solid green when the Source NDP unit is ready
to process documents.
3–2
Figure 3–1. Power On/Off Switch
4326 6295–002

Advertisement

Table of Contents
loading

Table of Contents