Installation Guide
4.9.
Performing a network test
After finishing installation, perform a network test, to ensure that communica-
tion between all added devices and the Danfoss Link™ CC is stable.
Note! Do not perform the network test before the Danfoss Link™ CC is mounted in
its final position and ensure that all living connects® are out of mounting mode, see
instructions following the living connect®.
1. Turn off the battery pack.
2. Slide the Danfoss Link™ CC onto the previously
installed mounting plate.
3. The Danfoss Link™ CC will now power-up.
4. Remove the front cover and press the SETUP
pin for 3 seconds to enter the service area.
If there is uncertainty about the network performance, it is recommended to
perform a network test before the installation is completed entirely.
Danfoss Heating Solutions
Danfoss Link™ CC
VISGL702
06/2013
19
Need help?
Do you have a question about the Link CC and is the answer not in the manual?
Questions and answers