Performing A Network Test After Adding New Devices; Leaving The Service Area In Danfoss Link™ Cc; Maintenance; Removing An Output - Danfoss Link Hydronic Controller Installation Manual

Table of Contents

Advertisement

Installation Guide Danfoss Link™ HC
5.6

Performing a network test after adding new devices

After finishing installation, perform a network test to ensure that communication between
added devices and the Danfoss Link CC™ is stable.
Note! Do not perform the network test before the Danfoss Link™ CC is mounted in its final
position.
Service Options
1
Status and Diagnostics
At the end of the network test the Danfoss Link™ CC awaits for all battery operated devices
to wake up and report. Follow the instructions given on the screen. If the network test is
running smoothly, there will be no need for further interaction. If the network test is per-
forming slow, the Danfoss Link™ CC guides through troubleshooting and gives useful tips
for speeding up the process.
5.7
Leaving the service area in Danfoss Link™ CC
Press the SETUP pin for 3 seconds and put back the front cover to the Danfoss Link™ CC.

6. Maintenance

6.1

Removing an output

Service Options
1
Rooms and Devices
Configure Room
4
Room devices
Remove Output
7
Yes, remove output now
Danfoss Heating Solutions
Status and Diagnostics
2
Network
?
Rooms and Devices
2
Manage Devices
?
Room Devices
5
Remove a device
?
?
VIFZL402
Wireless Network Status
3
Start Network Test
?
Select Room
3
Select existing room
?
Room Devices
6
Remove an output
?
?
?
?
06/2013
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents