Installation Guide
4. Installation
Danfoss Link™ CC can be installed
with either a PSU (in-wall power
supply) or a NSU (net power sup-
ply).
Installing Danfoss Link™ CC with In-Wall PSU
• Hold the PSU over the wall box and mark up the 4
screw holes.
Make sure the top is level.
• Drill holes and put fitting plugs in.
• Connect the PSU according to the connection diagram
on the back side.
• Mount the PSU with the 4 screws.
12
06/2013
Danfoss Link™ CC
VISGL702
!
Do not
Avoid direct sun-
install in
light to Danfoss
bathrooms
Install in
height of
Link™ CC
140-170 cm
UP
PSU
Danfoss Heating Solutions
Need help?
Do you have a question about the Link CC and is the answer not in the manual?
Questions and answers