3. Guidelines for installation

The signal strength is sufficient for most applications, however, wireless signals
are weakened on the way from the Danfoss Link™ CC to the room devices and
each building has different obstacles.
Ensure the best performance by keeping the following in mind for planning and
installation:
• Max. 30m between devices in free space.
• Receiving devices should be placed on opposite or next wall as the transmit-
ter, if possible.
• All metallic parts in the building construction can weaken wireless signals.
• Reinforced concrete walls and floors weaken the signal strength significantly,
but almost all types of construction materials reduce the signal to some
degree.
• Corners, which is a result of the design of the building, can weaken the
wireless signals, due to either a longer distance or missing reflecting
opportunities.
Note! To get a good overview of the devices in each rooms, and their placement,
Danfoss recommends that an installation plan is made before beginning the actual
installation.