Gas Conversion; Preliminary Operations; Control Panel - Sime UNIQA REVOLUTION Original Instructions Manual

Low temperature wall mounted boiler
Table of Contents

Advertisement

7.6

Gas conversion

models can be transformed from operating
UNIQA REVOLUTION
with G20 (methane) to G30/G31 (LPG), by installing the "Nozzle
kit for G30/G31" code 8059250, to be ordered separately from
the boiler, , also modifying "PAR 03" .
m
CAUTION
The maintenance interventions described must ONLY
be carried out the professionally qualified personnel.
a
WARNING
Before carrying out any interventions described:
– set the main system switch to "OFF"
– close the gas valve
– make sure that no hot parts inside the appliance are
touched.
OFF
7.6.1

Preliminary operations

To carry out the conversion:
– remove the screws (1), pull the front panel (2) forwards and
release it from the top by lifting it
2
Fig. 43
1
Fig. 44
– remove the screws (3) securing the control panel (4)
– move the panel (4) upwards (a) but keeping it in the side
guides (5) to the end of travel
– bring it forwards and down (b) until it is horizontal
4
b
3
– unscrew the screws (6) and remove the panel (7) carefully
6
7
5
a
Fig. 45
Fig. 46
37

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the UNIQA REVOLUTION and is the answer not in the manual?

Questions and answers

Table of Contents