Sime 1R6 User Manual

Sime 1R6 User Manual

1r series; 2r series; 2r gt series;
Hide thumbs Also See for 1R6:

Advertisement

Remove the "Testing Certificate" from inside the combustion chamber and
keep together with the instructions manual.
The package of the "2R GT" boiler contains instructions for installation, ope-
ration and maintenance of the diesel burner.
CONTENTS
1
1. 1
INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
1.2
1.3
1.4
LOSS OF HEAD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
1.5
COMBUSTION CHAMBER DIMENSIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
1.6
2
2. 1
BOILER ROOM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
2.2
2.3
2.4
2.5
BOILER BODY ASSEMBLY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
2.6
2.7
ELECTRICAL CONNECTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
2.8
ASSEMBLY OF "RVA 43.222" CLIMATE CONTROLLER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
3
3. 1
COMMISSIONING THE BOILER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
3.2
3.3
3.4
3.5

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 1R6 and is the answer not in the manual?

Questions and answers

Summary of Contents for Sime 1R6

  • Page 1: Table Of Contents

    Remove the “Testing Certificate” from inside the combustion chamber and keep together with the instructions manual. The package of the “2R GT” boiler contains instructions for installation, ope- ration and maintenance of the diesel burner. CONTENTS BOILER DESCRIPTION 1. 1 INTRODUCTION .
  • Page 2: Boiler Description

    BOILER DESCRIPTION 1. 1 INTRODUCTION The cast iron boilers “2R GT” for gas-oil casing with enclosed documents and has been designed in compliance with control panel. The cast iron boilers “1R/2R freestan- the European Directive 92/42/CEE. ding” for gas-oil or gas has been desi- “2R GT”...
  • Page 3: Loss Of Head

    1.3.2 “2R/2R GT” boiler Output 100.6 123.8 147. 1 165. 1 179.7 197.7 213.4 230.2 248.8 266.9 kcal/h 86,500 106,500 126,500 142,000 154,500 170,000 183,500 198,000 214,000 229,500 Input 113.5 139. 1 164.7 184. 1 199.7 219.7 237. 1 255.8 276.4 296.7 kcal/h 97,600...
  • Page 4: Combustion Chamber Dimensions

    – – – 60° 1.6.3 F.B.R. gas-oil burners Boiler Model Atomising Boiler Model Atomising angle angle 1R6÷8 G2 2001 60° FG 14 TC 60° 1R9 - 2R6 G2 MAXI 60° 2R9÷13 G 20 TC 60° FG 14 TC 60° 2R14-15 G 30/2 TC 60°...
  • Page 5: Installation

    1.6.4 RIELLO gas burners Boiler Model Output (kW) Electrical 1°stage 2°stage data type ± 1R 6÷9 GS10 42÷116 – 230V 50Hz G20/25 - G30/31 ± 2R 6 GS10 42÷116 – 230V 50Hz G20/25 - G30/31 ± 2R 7÷8 BS 3 65÷189 –...
  • Page 6: Boiler Body Assembly

    nal section of the flue must be fitted tighter side and, by applying a little with a static exhaust device that force, bring the two pieces together ensures cons t ant and ef ficient so that they are parallel. extraction of products generated by The sections can be considered pro- combustion;...
  • Page 7: Electrical Connection

    The room thermostat (requi- NOTE: Device must be connected to before doing any work on the electri- red for enhanced room temperatu- an efficient earthing system. SIME cal panel. “1R/2R” boilers Main switch TA Room stat (not supplied) C.H.
  • Page 8: Assembly Of "Rva 43.222" Climate Controller

    “2R GT” boiler Fuse (T 6A) UA Type QAA70 room temperature control unit Main switch (optional) SB Burner shutdown emergency light SE Outdoor temperature probe (optional) TC Two-stage control thermostat SC Type QAZ21 boiler probe (optional) TS Safety thermostat SS Type QAZ21 hot water probe (optional) Burner System pump PB Boiler pump...
  • Page 9: Use And Maintenance

    USE AND MAINTENANCE 3. 1 COMMISSIONING THE BOILER When commissioning the boiler it is recommended: – to make sure that the system has been filled with water and adequa- tely vented; – to make sure that the flow and return valves are fully open; –...
  • Page 10: How To Use The "Rva 43.222

    HOW TO USE THE “RVA 43.222” To make the most of your “RVA 43.222” controller, follow the instructions provided below: TO TURN ON THE HEATING IF THE ROOMS ARE TOO HOT OR TOO COLD – Turn on the main switch. –...

Table of Contents