·7.
Install the cable ground bracket as shown in figure
3-3.
8. If the dot graphics board is not installed yet, go to the
installation procedure for the dot graphics board.
If the
dot graphics board is already installed, reassemble the
terminal as specified in the reassembly steps for
procedures 4, 3, and 1.
NUT
-~
GRAPHICS BOARD
04428-3
Figure
3-3.
Installation of Touchpanel Cable Ground Bracket
INSTALLATION OF DOT GRAPHICS BOARD
The procedures referred to in the following steps are in section
6B.
To install the dot graphics board, do as follows:
•
3-4
62940034 E
,r
(
/ -
'-
Need help?
Do you have a question about the CDC CC63X and is the answer not in the manual?