BLOWBY GAS RETURN SYSTEM
<Type A>
Removal sequence
1 Breather pipe
2 Breather hose
3 Breather hose
4 Oil hose
5 PCV valve bracket
Installation sequence
Perform installation by following the removal sequence in reverse.
Tightening torque (Unit: N·m {kgf·m})
Mark
Clamp
Clamp
Lubricant and/or sealant
Mark
O-ring
6 Oil hose stay
7 Cap
8 O-ring
9 Element
10 PCV body
Parts to be tightened
Points of application
a: Rocker cover
*
b: Breather hose
*
: Non-reusable parts
PCV: Positive crankcase ventilation
Tightening torque
4.9 {0.5}
4.0 to 5.0 {0.4 to 0.5}
Specified lubricant and/or sealant
Engine oil
17
Remarks
–
–
Quantity
As required
17-9