Disconnection And Connection Of Hoses And Pipes; Removal Sequence; Installation Sequence - Mitsubishi 6M60-TL Service Manual

Table of Contents

Advertisement

DISCONNECTION AND CONNECTION OF HOSES AND PIPES

Removal sequence

1 Water hose
2 Eyebolt
3 Joint pipe
4 Water hose

Installation sequence

Follow the removal sequence in reverse.
CAUTION
• Install each hose clamp to the angle indicated in the illustration so that sufficient clearance is assured be-
tween the hose clamp and its surrounding parts.
Tightening torque (Unit: N·m {kgf·m})
Mark
Clamp
Clamp
Eyebolt (joint pipe mounting)
14-10
5 Water hose
6 EGR cooler water pipe
7 Water hose
8 Water hose
Parts to be tightened
9 EGR cooler water pipe
10 Water hose
EGR: Exhaust gas recirculation
Tightening torque
3.9 ± 0.6 {0.4 ± 0.06}
4 to 5 {0.4 to 0.5}
25 {25}
Remarks

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents