C After Installing The Modules - Black Box ServLink ACR3500A Manual

Table of Contents

Advertisement

3.1.7.C After Installing the Modules

Once you've installed all your Modules, cables, power cords, etc., your power-
managed ServLINK system should be ready to be powered up. When you do so
(see the next section), the ServLINK's control software will automatically sense that
you've added the Power Management Modules. Refer to Section 5.1.3 for
instructions on configuring the Modules.
Figure 3-12 shows the logical layout of a ServLINK system that includes Power
Management Modules, and Figure 3-13 (on the following page) shows the physical
layout of such a system.
Figure 3-12. Management-Module connection logic.
ACCESS CONTROL CARD
DATA
IN
OUT
IN
OUT
OTHER DEVICES' POWER MANAGEMENT MODULES,
PASS-THROUGH DEVICE AT END OF CHAIN IF DESIRED
SERVLINK UNIT
RS232 COMM
SERVLINK'S DEDICATED
POWER MANAGEMENT MODULE
DATA
SERIAL
IN OUT
SERVER PC
RS232 COMM
FIRST DEVICE'S
POWER MANAGEMENT MODULE
DATA
SERIAL
IN OUT
OTHER SYSTEMS
CHAPTER 3: Installation
OPTIONAL
MODEM
27

Advertisement

Table of Contents
loading

This manual is also suitable for:

Servlink acr3600a

Table of Contents