B Installing The Modules Controlling Power To The Attached Devices - Black Box ServLink ACR3500A Manual

Table of Contents

Advertisement

3.1.7.B Installing the Modules Controlling Power to the Attached Devices

Take these steps to install each of the Power Management Modules you'll be using
to control power to the ServLINK's attached PC CPUs, routers, and other devices:
1. Power down the device that the Module will be power-controlling.
2. Plug one of the included RJ-45 cables into the "DATA IN" port on the
Management Module.
3a. If this is the first Management Module in the daisychain: Use RJ-45F-to-DB9F
adapter included with the Module to connect the other end of this cable to
one of the ServLINK's serial ports, as shown in Figure 3-11.
Figure 3-11. Attaching the cable from the first PC's Module to the
3b. If this is not the first Management Module in the chain: Connect the other end of
the RJ-45 cable to the "DATA OUT" port on the previous Module in the
chain.
Make careful notes of which devices you attach to which Modules, so
that you can associate the two in the ServLINK's software later, and
have accurate remote control. (The ServLINK's software will refer to the
first Module in the daisychain as "001," the second as "002," and so
forth.) See Section 6.1.2.
ServLINK.
NOTE
CHAPTER 3: Installation
RJ-45 to DB9
adapter
Serial control cable
from first Module
25

Advertisement

Table of Contents
loading

This manual is also suitable for:

Servlink acr3600a

Table of Contents