4

Quick Start

4.1

Unpacking

Unpack the calibrator carefully and inspect it for any damage that may have oc-
curred during shipment. If there is shipping damage, notify the carrier
immediately.
Verify that the following components are present:
• 9132 Calibrator
• Power Cord
• User's Guide
• Serial Cable
• 9930 Software
4.2

Set Up

Place the calibrator on a flat surface with at least 6 inches of free space around
the instrument. The prop may be swung down to raise the front of the instru-
ment from a horizontal position. Plug the power cord into a grounded mains
outlet. Observe that the nominal voltage corresponds to that indicated on the
back of the calibrator.
Turn on the power to the calibrator by toggling the power switch on. The fan
should begin quietly blowing air through the instrument and the controller dis-
play should illuminate after 3 seconds. After a brief self-test the controller
should begin normal operation. If the unit fails to operate please check the
power connection.
The heater will start operating to bring the temperature of the calibrator to the
set-point temperature and the display will begin to show the actual target
temperature.
4.3

Power

Plug the dry-well power cord into a mains outlet of the proper voltage, fre-
quency, and current capability. Refer to Section 3.1, Specifications for power
details. Turn the dry-well on using the rear panel "POWER" switch. The
dry-well will turn on and begin to heat to the previously programmed tempera-
ture set-point. The front panel LED display will indicate the actual dry-well
temperature.