Calibration
● Call up function 1.
● Do not attach a weight, or remove the weight.
● Acknowledge the measurement.
● Record the value from box 2 in the calibration certifi cate.
● Call up function 3.
● Attach appropriate weight (500 cN)
● Acknowledge the measurement.
● Record the value from box 4 in the calibration certifi cate.
● Carry out all measurements from 100 cN to 1000 cN in succession and record the corre-
● After completing all measurements, quit the calibration menu.
126
The measured value appears in box 2.
The measured value appears in box 4.
sponding values in the calibration certifi cate.
Industrial
2
4
3
1