Setting Up - Pyronix Enforcer 64 Installation Manual

Table of Contents

Advertisement

Figure 3: Rear view
1: RS232 connection for up/downloading to the InSite software.
2: The location of the control panel backup battery.
3: The power connection for a GPRS modem.
4: The connection for an I/O board if connected.
5: The connection for the modem installed.
6: The power connection (+12V DC) for the Enforcer.

Setting Up

It is recommended that the Engineer Menu is accessed prior to opening a powered
Enforcer.
Before you install a new panel peripheral, such as a modem, I/O board, or expander, power
off the Enforcer (mains and battery).
14
Enforcer Installation Guide
1
3
4
5
2
6
102017854 - V01

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Enforcer 64 and is the answer not in the manual?

Questions and answers

Table of Contents