Daikin DPS Installation And Maintenance Manual page 145

Microtech iii unit controller for rebel commercial packaged rooftop systems
Table of Contents

Advertisement

Figure 34: L9 – Inverter Compressor Starting Failure
Caution: Be sure to turn off power switch before connecting or
Check if the
compressor lead wires are
disconnected
Check if the
insulation resistance of the
compressor is 100kΩ
or over
Check 3
Check if the
power transistor is
normal
Unusual
compressor
noise?
*
Check 3
See page 129
www .DaikinApplied .com
disconnecting connectors to prevent parts damage .
YES
NO
YES
NO
NO
*
NO
YES
YES
YES
Fix the compressor lead wire
Correct the wiring; then restart
Replace the inverter compressor
Replace the compressor inverter PC board
Recheck the compressor/refrigeration circuit
Replace the inverter compressor
145
OM 1141-3 • MICROTECH UNIT CONTROLLER
t
rouBleshootIng

Advertisement

Table of Contents
loading

Table of Contents