Daikin Super Multi NX FFQ25B8V1B Service Manual page 458

E-series, f-series, g-series
Hide thumbs Also See for Super Multi NX FFQ25B8V1B:
Table of Contents

Advertisement

Trial Operation
BRC1E51A7
Before test operation
How to activate test operation
How to check airflow direction
How to deactivate test operation
446
Step
Action
1
Turn on the power supply more than 6
hours before test operation.
2
Open the gas stop valve.
3
Open the liquid stop valve.
4
Press and hold the [Cancel] button (
for 4 seconds to enter the Field setting
menu.
5
Use the
buttons to select Test
operation ON/OFF and push the [Menu/
Enter] button (
6
Test operation is displayed on the bottom
of the basic screen.
7
Push the [ON/OFF] button (
seconds to start the test operation.
8
Push the [Menu/Enter] button (
enter the Main Menu.
9
Use the
buttons to select Airflow
direction and push the [Menu/Enter]
button (
).
10
Check that the airflow direction is actuated
according to the setting and push the
[Menu/Enter] button (
11
Press and hold the [Cancel] button (
for 4 seconds to enter the Field setting
menu.
12
Use the
buttons to select Test
operation ON/OFF in the menu and push
the [Menu/Enter] button (
Remote controller
)
).
) within 10
) to
) .
)
).
SiBE121021_C
(R12872)
(R12873)
(R12874)
(R12875)
(R12876)
Trial Operation and Field Settings

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Super multi nx fvxs35fv1bSuper multi nx ffq35b8v1bSuper multi nx fbq35c7vebSuper multi nx ftxs35g2v1bSuper multi nx fvxs50fv1bSuper multi nx ffq50b8v1b ... Show all

Table of Contents