Configuration Data And Operation Ready Request; Operation Ready Request Program - Panasonic FP7 User Manual

High-speed counter unit
Hide thumbs Also See for FP7:
Table of Contents

Advertisement

4.3 Configuration Data and Operation Ready Request

4.3.1 Operation Ready Request Program

• For enabling the settings of the high-speed counter unit, the operation ready request
program should be executed.
• After downloading a project, insert the program to make it be executed early in the process.
 Operation ready request program
Example) Program to request the preparation of the CH0 operation of the high-speed counter
unit installed in the slot 1
R100
DF/
Activate operation
ready request
R100
DF
Activate operation
ready request
Y100
Operation ready
request
X100
Operation ready
done flag
 Allocation of I/O signals
Signal name
Operation ready request
Operation ready done flag
(Note 1): The above I/O numbers are those for the slot number 1 and the starting word number 10. The I/O numbers
actually used vary according to the slot number where the unit is installed and the starting word number.
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.clrwtr.com - Email: info@clrwtr.com
R101
Stops high-speed
counter operation
(To an arbitrary program)
R101
Stops high-speed
counter operation
Y100
Operation ready
request
Effective
CH0
condition
Level
Y100
-
X100
CH1
CH2
CH3
Y110
Y120
Y130
X120
X140
X160

Advertisement

Table of Contents
loading

Table of Contents