Installation; Electrical - ETC Source Four XT HID Zoom User Manual

15 - 30 and 25 - 50
Table of Contents

Advertisement

Installation

Install on a suitable, rigid permanent base with secured bolts. This can include poured concrete
pads, factory-supplied pole-top and wall-mount brackets, and other attachments which meet the
published weight and wind-load requirements for the fixture. Use the full-sized template that is
included in the installation instructions or download the template at www.etcconnect.com.
XT HID 15-30
39 lbs. exclusive of accessories, color filters, and patterns.
XT HID 25-50
34.5 lbs. exclusive of accessories, color filters, and patterns. 1.15 square feet of effective projected area (EPA)
W A R N I N G :
W A R N I N G :
E l e c t r i c a l
C A U T I O N :
The fixture is completely pre-wired at the factory; there is no need for entry into the ballast housing.
6
Source Four XT HID
Weight
Do not use this fixture with a damaged power lead. If the power lead
(cordset) is damaged, it must be replaced. Failure to follow this warning can
result in serious injury or death.
All third-party mounting hardware should be corrosion-resistant and
designed for use where installed.
The fixture must be grounded and wired in accordance with national, state and
local electrical codes. Failure to do may result in serious personal injury.
Wind Load
1.4 square feet of effective projected area (EPA)
Source Four XT HID Zoom User Manual

Advertisement

Table of Contents
loading

Table of Contents