6. Setup process of a X8 rental display
Image 6-5
4. The next stage is the power and data cabling of the X8 rental display. See chapter "Cabling of the X8 display", page 53.
Warning:
Risk of electric shock / Risk of fire:
To protect against risk of fire caused by overloading of power cables, MAXIMUM 4 X8 Connection Boxes may be
connected in parallel. Each power source cable supplying maximum 4 X8 Connection Boxes should be protected
by a circuit breaker or fuses rated 16 A / 250 VAC (15 A / 250 VAC in the USA and Canada). Note that one X8
Connection Box requires 200-240 VAC, 50-60 Hz, 3.6 amps at 200 VAC.
5. Installation of the digitizer(s). Note that the X8 rental tiles require an NNI based digitizer such as the DX-700 digitizer. The
firmware of the Digitizer must have version v3.04 or later. Follow the installation guidelines in the manuals of these products.
6. Installation of the control software for the X8 rental display. See installation procedure described in the manual of the Direc-
tor toolset.
7. Apply power to the X8 rental display and start up the control software. For more information about showing content on the X8
display see manual of the Director toolset.
W
ARNING
34
:
The maximum height of a base stand X8 rental display is 3 tiles high.