Uponor Smatrix Base Installation And Operation Manual page 41

Hide thumbs Also See for Smatrix Base:
Table of Contents

Advertisement

d
ireCt ConneCtion to Controller and slave
module
Every thermostat in the example is connected to the
controller and slave module (if available) with its own
cable.
C
onneCtion to attaChed star module
The star module is attached to the controller and slave
module (if available) adding extra connection terminals
to the system. Each thermostat in the example is
connected direct to the controller, slave module (if
available) and star module.
C
onneCtion to CaBle ConneCted star module
The star module is connected to the controller and/
or slave module (if available) with a cable, using two
of the extra connection points. Each thermostat in the
example is connected direct to the star module, except
one that is connected with daisy chain.
U P O N O R S M AT R I X B A S E / B A S E P R O · I N S TA L L AT I O N A N D O P E R AT I O N M A N U A L
C
onneCt CommuniCation CaBle to Controller
/
and
or slave module
2
3
1
A
B
+ -
A
B
To connect a communication cable to the controller:
1. Lead the cables through cable entries on the top of
the controller frame.
2. Insert the four wires (A,B, + and -) into the
connector on the controller.
3. Tighten the screws fixing the wires in the connector.
UK
CZ
DE
DK
3
EE
ES
1
FI
+ -
A
B
+ -
FR
HR
HU
IT
LT
LV
NL
NO
PL
PT
RO
RU
SE
SK
4 1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Smatrix base pro

Table of Contents