Powering On And Off - GE Transport PT878 Abridged Manual

Portable liquid ultrasonic flowmeter
Hide thumbs Also See for Transport PT878:
Table of Contents

Advertisement

Powering ON and OFF

Installation & Operation
For CE compliance, the PT878 is classified as a battery-
powered device, not to be used with the AC adapter. To
comply with CE certification, do not operate the meter
with the charger plugged in.
To power the PT878 ON, press the red button in the upper-right-hand
corner of the keypad. Immediately upon power up, the PT878 emits a
short beep and displays a "PCI Loader" message. It then validates
the instrument programming, displays the GE Sensing logo and the
software version, and emits a long beep. If the meter fails any of these
tests, contact GE Sensing.
If the meter fails the backup battery test, you must send
the unit back to the factory for a battery replacement.
After the meter conducts all the self checks, a screen similar to Figure
1-3 below appears.
ABC.SIT
Velocity, ft/s
0.00
Delta-T, ns
0.10
E0: No Errors
Figure 1-3: Screen After Powering ON
Caution!
!WARNING!
2000/11/30
09:53 AM
Signal, dB
32
Volume, l/s
0.0
August 2008
1-7

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Transport PT878 and is the answer not in the manual?

Table of Contents