Installation Procedures; Step 1 - Positioning; Step 2 - Fastening - Zip 303061 Installation And Operating Instructions Manual

Table of Contents

Advertisement

Approximate Weight When Filled
3.0 Litre models
5.0 Litre models
7.5 Litre models
VENT
COLD
OUTLET
INLET
100 mm
minimum
clearance
150 mm
Page 4 of 24
Installation Requirements
d) Outlet drainage to a sink draining board or to a drip tray.
e) Access to drainage from a vent situated at the base of the
12.5 kg
heater.
16.5 kg
f) In all installation instances the walls of the heater must be
20.5 kg
vertical and the base horizontal, there can be no exceptions to
this rule.

Installation Procedures

Before You Begin
Refer to the mounting-hole template on page 17.
Read the installation and operating instructions completely.
Decide whether to install with concealed or exposed plumbing and/
or electrical connections. Concealed connections are preferred for
superior appearance.
INLET
POSITION
Step 1 – Positioning
VENT
POSITION
Position the heater so the tap will drain on to a draining board or
drip tray.
Position the base of the tap to be not less than 215 mm above the
draining board (height should be increased only if essential for
20 mm
filling larger vessels).
minimum
clearance
Provide clearance for service access of not less than 100 mm top,
from right
edge to wall
150 mm left, 20 mm right.
Mark corner positions for the heater on the wall so as to position
the paper mounting-hole template.
Step 2 – Fastening
Position mounting-hole template on wall and drill holes where
215 mm
shown.
Drill holes for water inlet, vent outlet and wiring if rear access is
intended.
Remove cover fastening screws from heater and lift whole cover
off heater.
Spout detail
804546 03.17 1.00

Advertisement

Table of Contents
loading

This manual is also suitable for:

305062Hydroboil series303062307062305061307061

Table of Contents