Installation Procedures; Step 1 - Positioning; Step 2 - Fastening - Zip Autoboil 315052 Installation And Operating Instructions Manual

Table of Contents

Advertisement

Approximate Weight When Filled
15 Litre models
25 Litre models
40 Litre models
COLD
VENT
INLET
OUTLET
80 mm minimum
100 mm
clearance from
minimum
left edge to wall
clearance
300 mm
Page 4 of 24
Installation Requirements
all-pole disconnection with a switch contact separation of at
least 3 mm (see step 3.3 on page 6).
c) Cold water supply with a minimum working pressure of 70 kPa
and a maximum working pressure of 700 kPa connected via an
34.5 kg
isolation valve.
47 kg
d) Outlet drainage to a sink draining board or to a drip tray.
71 kg
e) Access to drainage from a vent situated at the base of the
heater.
f ) If the water pressure is likely to exceed 700 kPa, a 350 kPa
pressure reducing valve must be installed in the cold water supply
line.
f) In all installation instances the walls of the heater must be
vertical and the base horizontal, there can be no exceptions to
this rule.

Installation Procedures

Refer to the mounting-hole template on page 19.
Read the installation and operating instructions completely.
Decide whether to install with concealed or exposed plumbing and/
or electrical connections. Concealed connections are preferred for
superior appearance.
INLET
POSITION
Step 1 – Positioning
VENT
Position the heater so the tap will drain on to a draining board or
POSITION
drip tray.
Position the base of the tap to be not less than 300 mm above the
draining board (height should be increased only if essential for
filling larger vessels).
Provide clearance for service access of not less than 100 mm top,
150 mm to its right and 80 mm to its left.
Mark corner positions for the heater on the wall so as to position
the paper mounting-hole template.
150 mm
Step 2 – Fastening
Position mounting-hole template on wall and drill holes where
shown.
805194 09.17 1.02