4 System Debugging

4.1 Setting up a Debugging Environment

Use a power adapter or PoE to power the AP.
Setting up the Environment
Verify that the AP is properly connected to the power source.
Connect the AP to an AC through a twisted pair cable.
When the AP is connected to a PC for debugging, verify that the PC and PoE switch are properly grounded.

4.1.1 Powering up the AP

4.1.1.1 Checking before power-up
Verify that the power supply is properly connected.
Verify that the input voltage matches the specification of the AP.
4.1.1.2 Checking after power-up (recommended)
After powering up, it is recommended that you check the following to ensure normal operation of the AP.
Check if any message is printed on the Web-based configuration interface of the AC.
Check if the LED works normally.
·

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the RG-AP530-I V2 Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents