Siemens SIMATIC S5 Manual page 96

Interface of the programmable controller
Hide thumbs Also See for SIMATIC S5:
Table of Contents

Advertisement

Data Transmission Using a Standard Connection
Programmable Controller 2
Proceed as follows:
Assign parameters in the DB1 of programmable controller 2 as described in section 4.2.
Program the individual blocks as described in the following section.
Transfer blocks DB1, OB1, DB8, and DB9 to programmable controller 2.
Cyclical Program for Station 2 (Programmable Controller 2)
The following was set in DB1:
Send mailbox is in DB8 starting with data word DW0.
Receive mailbox is in DB9 starting with data word DW0.
Send coordination byte is in flag byte FY60.
Receive coordination byte is in flag byte FY61.
OB1 for PLC 2
SEGMENT 1
0000
:
0001
: JU
0002
NAME : L2-STAND
0003
ANST : F 50.0
0004
ZIEL : KF 1
0005
LAEN : KF 4
0006
: BE
FB1 for PLC 2
SEGMENT 1
NAME
:
L2-STAND
DES
:
ANST
DES
:
ZIEL
DES
:
LAEN
0008
: A
0009
: JC
000A
: A
000B
:
000C
:
000D
:
000E
:
000F
:
0010
:
0011
: AN
0012
: S
0013
:
4-12
0000
Transmit to station 1.
FB 1
Transmit trigger bit, has to be set by user program, (is reset
after the transmit job is completed)
Station 1
Frame length of transmit data: 4 bytes
0000
I/Q/D/B/T/Z: E
BI/BY/W/D: BI
I/Q/D/B/T/Z: D
KM/KH/KY/KS/KF/KT/KC/KG: KF
I/Q/D/B/T/Z: D
KM/KH/KY/KS/KF/KT/KC/KG: KF
F 61.7
= M001
DB 9
F 61.7
F 61.7
Explanation
Explanation
L2 standard connection
If receive mailbox enabled to receive,
jump to 'SEND' program section.
Open receive mailbox data block
============================================
Program section for evaluation of received data
============================================
CBR bit 'Enable receive'
Enable RM to receive
S5-95U, SINEC L2
EWA 4NEB 812 6112-02

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sinec l2S5-95u

Table of Contents