Siemens SIMATIC S5 Manual page 47

Interface of the programmable controller
Hide thumbs Also See for SIMATIC S5:
Table of Contents

Advertisement

S5-95U, SINEC L2
SINEC L2 Bus Connector
in the Bus Segment
Stripping the bus cable
approx. 6 mm
approx. 12 mm (1/2 in.)
Cable
shielding
Mounting the bus cable onto
the SINEC L2 bus connector
Switch position "OFF"
(=terminator not connected)
A
B
A
B
Figure 2-3. Cutting the Bus Cable, Stripping the Insulation, and Connecting the
390
220
390
X1
X1
A
B
Figure 2-4. Circuit diagram of the SINEC L2 Bus Connector
EWA 4NEB 812 6112-02
(1/4 in.)
approx. 12 mm
(1/2 in.)
Bare shielding must contact
the metal guide.
SINEC L2 Bus Connector
M 5V2 (data reference potential)
P 5V2 (supply voltage +)
RXD/TXD (B)
RXD/TXD (A)
A
B
SINEC L2 Bus Connector
at the Begining or End of a Segment
Stripping the bus cable
approx. 6 mm (1/4 in.)
approx. 12 mm (1/2 in.)
Cable
shielding
Mounting the bus cable onto
the SINEC L2 bus connector
Switch position "ON"
(terminator connected)
A
B
A
B
Bare shielding must
contact the metal guide.
9-pin submin. D connector
(pin assignment: see Figure 3-3,
chap. 3.1)
Installation Guidelines
approx. 12 mm
(1/2 in.)
2-3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sinec l2S5-95u

Table of Contents