Installation 3-1 Separating - Optex SL-100 TNR Installation Instructions Manual

Smart line series. battery operated photoelectric detector
Hide thumbs Also See for SL-100 TNR:
Table of Contents

Advertisement

3
INSTALLATION
3-1
SEPARATING
Remove the battery cover.
1
1
Loosen the
battery cover
lock screw.
Remove the main unit from the back box.
4
2
1
1
Turn the optical unit
90 degrees and
loosen the screw.
Remove the main unit mounting bracket.
5
3-2
WALL MOUNTING
Using a screwdriver or similar tool, break the knockout position (×2) in the back box as shown.
1
Break the knockout
from inside of the
back box as shown
direction, to avoid
the making burrs.
Remove the main unit cover.
2
2
1
Pull
Do not place the main unit where it is exposed to
direct sunlight. Doing so may cause damage to the
product.
2
Loosen the
Pull
main unit cover
lock screw.
3
2
Take the main unit out of the back box.
Caution
Knockout position
WALL
EN-5
Remove the connectors.
3
POLE (1)
POLE (2)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sl-200 tnrSmartline series

Table of Contents