Section 2: S530 site preparation and installation
S530 system preparation checklist
Site
Item
Electrical
Item
power
Is adequate and proper electrical power available (see
specifications)?
Is something connected to the same power source that generates noise?
Is something that requires substantial amounts of current connected to the same power source?
Did you prepare power outlets for service, testing, or maintenance?

Unpacking the S530 system

The Keithley field service engineer (FSE) is responsible for unpacking the S530 system cabinet and
the accessories. However, it is recommended that the customer move the crate and the accessories
box to the area where the system is going to be used. Here is a list of tools needed for unpacking:
Safety glasses
Gloves
Standard screwdriver
Socket wrench
Socket head: 19 mm (3/4 in.)
The following information will help the FSE unpack the system. The system is shipped in a wooden
crate (see the following figure).
2-2
Figure 2: S530 system cabinet in shipping crate
S530 Parametric Test System Administrative Guide
Line power requirements
(on page 2-17) for
S530-924-01 Rev. D / September 2017