S530 Site Preparation And Installation - Keithley S530 Administrative Manual

Parametric test system
Hide thumbs Also See for S530:
Table of Contents

Advertisement

In this section:
Site preparation checklist ......................................................... 2-1
Unpacking the S530 system..................................................... 2-2
System cabinet size and weight ............................................. 2-16
Power and operating conditions ............................................. 2-17
Triaxial connector handling and avoiding contamination ........ 2-18
Lockout and tagout ................................................................. 2-19
Installation and connections ................................................... 2-20
Floor plan ............................................................................... 2-20
System securement ............................................................... 2-23
Optional advanced seismic securement ................................. 2-25
Site preparation checklist
The following table provides a site preparation checklist to help you prepare your site for the S530
system in your facility. If you find that an item listed is not valid for your site, you can indicate it with
"N/A."
S530 system preparation checklist
Site
Floor plan Item

S530 site preparation and installation

Item
Is it necessary to have lifting equipment?
Is the flooring adequate and able to support the weight of the system while moving from receiving
to the final destination (see
Are all of the corridors and hallways large enough to allow clearance for the system?
Are stairways adequate for moving the system through?
Are elevators needed to move the system? Can they support the size and weight of the system?
Are the doorways wide enough for the system?
If you are using a Keithley Instruments probe card adapter, you must supply a vacuum connection
(50.80 cm Hg / 20 in.).
Did you complete the system layout (see
Does your layout show all of the locations for all of the equipment?
Does your system layout show the locations of all doors and aisles?
Does your layout allow for the proper clearance of the system for the front, rear, and the
keyboard/monitor arm?
Is there enough space for personnel safety, comfort, and freedom of movement?
Did you take future expansions into consideration?
Is there sufficient space for any supplies or manuals?
Floor plan
(on page 2-20) for specifications)?
Floor plan
(on page 2-20) for specifications)?