S530 Parametric Test System Administrative Guide
Section 2: S530 site preparation and installation
6. Remove the crate clamps and slide the outer box cover off the crate.
Figure 9: Sliding the outer box off the crate
7. Make sure that you retract the leveling feet on the bottom of the system (next to the casters) to
put weight on the casters and prepare the system to be rolled down the ramp.
Figure 10: Leveling feet
S530-924-01 Rev. D / September 2017
2-7