7.5
Shutting down
7.5.1 Temporary shut-down
Fig. 5: Temporary shut-down
1.
Disrupt the spraying process by releasing the pull lever ( Fig. 5/1).
2.
Close the material supply and switch off the fluid pressure pump if necessary.
3.
Release the residual energy by activating the pull lever ( Fig. 5/1).
7.5.2 Long-term shut-down
Fig. 6: Long-term shut-down
GB–24
Operating instructions
T-Dok-198-GB-Rev.3
mail@krautzberger.com, www.krautzberger.com