15.
Release the residual energy by activating the pull lever.
16.
Close the locking lever again.
6.4
Shutting down
6.4.1 Temporary shut-down
Fig. 3: Temporary shut-down
1.
Disrupt the spraying process by releasing the pull lever ( Fig. 3/1).
2.
Close the material supply and switch off the fluid pressure pump if necessary.
3.
Release the residual energy by activating the pull lever ( Fig. 3/1).
4.
Flip the locking lever ( Fig. 3/2).
6.4.2 Long-term shut-down
Fig. 4: Long-term shut-down
GB–22
Operating instructions
T-Dok-666-GB-Rev.1
mail@krautzberger.com, www.krautzberger.com