Table Of Contents; Job Specification Sheet; How To Use This Manual; Equipment Configuration - Fleck 9100TS Upflow Service Manual

Smart softener
Table of Contents

Advertisement

TABLE OF CONTENTS

JOB SPECIFICATION SHEET .................................................... 2
HOW TO USE THIS MANUAL .................................................... 2
EQUIPMENT CONFIGURATION ................................................ 2
SAFETY INFORMATION ............................................................ 3
INSTALLATION INSTRUCTIONS ............................................... 3
CONTROLLER FEATURES ........................................................ 6
INITIAL STARTUP INSTRUCTIONS .......................................... 7
USER PROGRAMMING ............................................................. 8
PROGRAMMING MODE ............................................................ 11
AUTOMATIC CLEANING CYCLE ............................................... 15
WIRING DIAGRAMS .................................................................. 16
POWERHEAD ASSEMBLY......................................................... 17
9100 CONTROL VALVE ASSEMBLY .......................................... 18
9100 SECOND TANK ASSEMBLY ............................................. 19
TURBINE METER ASSEMBLY - P/N 60626 ............................. 20
PADDLE METER ASSEMBLY -P/N 60086-50 ........................... 20
1" METER ASSEMBLY - P/N 60622 .......................................... 21
BYPASS VALVE ASSEMBLY (METAL) ........................................ 22
BYPASS VALVE ASSEMBLY (PLASTIC) ..................................... 22
SAFETY BRINE VALVE .............................................................. 23
PROBE KIT ............................................................................... 24
TROUBLESHOOTING ................................................................ 25
9000/9100 METER FLOW DATA ................................................ 26
1600 SERIES INJECTORS) ....................................................... 27
9100 CONTROL DIMENSIONS.................................................. 28
WATER CONDITIONER FLOW DIAGRAMS ............................... 29
SERVICE ASSEMBLIES ............................................................ 31

JOB SPECIFICATION SHEET

Job No: _____________________________________________
Model No: ___________________________________________
Water Test: __________________________________________
Capacity Per Unit: _____________________________________
Mineral Tank
Size: ____________ Diameter: ___________Height: _________
Brine Tank Size and Salt Setting per Regeneration: _________
9100TS Control Valve Specifications:
1. Regeneration Program Setting:
a. Brine and Slow Rinse: ______________________ Minutes
b. Backwash: _______________________________ Minutes
c. Rapid Rinse: _____________________________ Minutes
d. Brine Tank Refill: _________________________ Minutes
2. Drain Line Flow Control: _________________________ gpm
3. Brine Refill Rate: _______________________________ gpm
4. Injector Size: ______________________________________

HOW TO USE THIS MANUAL

This installation manual is designed to guide the installer
through the process of installing and starting water
conditioning systems featuring the 9100TS controller.
This manual is a reference and will not include every system
installation situation. The person installing this equipment
should have:
• Training in the 9100TS control and the 9000/9100 valve.
• Knowledge of water conditioning and how to determine
proper control settings.
• Adequate plumbing skills.

EQUIPMENT CONFIGURATION

9100TS Configuration
CALIFORNIA PROPOSITION 65 WARNING
This product contains chemicals known to the
WARNING:
State of California to cause cancer or birth
defects or other reproductive harm.
Figure 1

Advertisement

Table of Contents
loading

Table of Contents