Dwell Time (Cycle 9, Din/Iso: G04) 11.2; Function; Cycle Parameters - HEIDENHAIN TNC 320 User's Manual For Cycle Programming

Hide thumbs Also See for TNC 320:
Table of Contents

Advertisement

11.2
DWELL TIME (Cycle 9, DIN/ISO: G04)

Function

This causes the execution of the next block within a running program
to be delayed by the programmed DWELL TIME A dwell time can be
used for such purposes as chip breaking.
The cycle becomes effective as soon as it is defined in the program.
Modal conditions such as spindle rotation are not affected.

Cycle parameters

Dwell time in seconds: Enter the dwell time in
seconds. Input range: 0 to 3600 s (1 hour) in steps
of 0.001 seconds
HEIDENHAIN | TNC 320 | User's manual for cycle programming | 9/2016

DWELL TIME (Cycle 9, DIN/ISO: G04) 11.2

NC blocks
89 CYCL DEF 9.0 DWELL TIME
90 CYCL DEF 9.1 DWELL 1.5
11
275

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tnc 320 programming station

Table of Contents