Initializing The New Docking Module; Defining Pump Speed - BW Technologies MicroDock II User Manual

Automatic test and calibration station
Hide thumbs Also See for MicroDock II:
Table of Contents

Advertisement

1. Deactivate the base station.
2. Remove the power cord from the POWER port. If applicable,
remove the charger cord from the CHARGER port.
3. Remove the end plate. There are three Phillips screws on the
front and three Phillips screws on the back.
4. Attach the new docking module.
Ensure the barbed fitting ports mate correctly with the gasket
block. Ensure that the male and female PCB connectors mate
correctly.

Initializing the New Docking Module

When a new docking module is connected, it must be initialized (setup to
communicate with the base station).
5. Simultaneously press and hold
docking module while pressing
station.
6. All of the LEDs on the new docking module light. On the base
station LCD, the following screen displays to confirm that the
new docking module has been successfully added.
7. Press
C
OK.
8. Deactivate the base station.
C
BUMP CHECK on the new
C
(leftmost button) on the base
The base station must be deactivated after each module has been
added.

Defining Pump Speed

The pump speed must be defined for each new docking module that is
connected.
Perform the pump setup procedures in a safe atmosphere only.
9. Reactivate the base station and wait until it enters normal opera-
tion.
10. Connect a hose to a flow meter and to inlet 1 (PURGE) on the
base station.
Allow the flow meter sufficient time to stabilize (approximately 30
minutes) before using it to ensure accurate flow readings.
11. From the base station, access the user options menu.
12. Press
C
or
C
13. Press
C
sel to activate the pump setup field ( changes to
The base station immediately begins pumping the ambient air.
MicroDock II
Adding Another Docking Module
a Caution
a Warning
to scroll to the Pump Setup option.
).
31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents